[1]
2020. Productivity Analysis in Assembly Department Using Objective Matrix (Omax) Method in Labor Intensive Manufacturing. International Journal of Engineering Research and Advanced Technology (ijerat) (E-ISSN 2454-6135) DOI: 10.31695/IJERAT. 6, 7 (Jul. 2020), 1–9. DOI:https://doi.org/10.31695/IJERAT.2020.3619.