[1]
Yurisdal and Budi Susetyo 2019. Factors Affecting Cost Overrun of RC-PIER Jabodebek LRT Project : A Case Study of Cawang, Indonesia. I. J. of Engineering Research and Advanced Technology - IJERAT (ISSN: 2454-6135), CrossRef: 10.31695/IJERAT. 5, 5 (May 2019), 01-09. DOI:https://doi.org/10.31695/IJERAT.2019.3436.