Productivity Analysis f Performance Measurement by (Earned Value Management) EVM in High-Level Building Projects . (2020). International Journal of Engineering Research and Advanced Technology (ijerat) (E-ISSN 2454-6135) DOI: 10.31695 IJERAT, 6(7), 18-26. https://doi.org/10.31695/IJERAT.2020.3624