Cost Analysis of Facade Work in High-Rise Building by Value Engineering Method. International Journal of Engineering Research and Advanced Technology (ijerat) (E-ISSN 2454-6135) DOI: 10.31695/IJERAT, [S. l.], v. 5, n. 7, p. 100–109, 2019. DOI: 10.31695/IJERAT.2019.3537. Disponível em: https://ijerat.com/index.php/ijerat/article/view/115.. Acesso em: 2 may. 2024.