[1]
“Productivity Analysis in Assembly Department Using Objective Matrix (Omax) Method in Labor Intensive Manufacturing”, IJERAT, vol. 6, no. 7, pp. 1–9, Jul. 2020, doi: 10.31695/IJERAT.2020.3619.