[1]
“Production Scheduling Model and Machine Assignment to Automotive Parts Manufacturing for Optimum Production ”, IJERAT, vol. 9, no. 7, pp. 20–34, Jul. 2023, doi: 10.31695/IJERAT.2023.9.7.3.