“Cost Analysis of Facade Work in High-Rise Building by Value Engineering Method”. International Journal of Engineering Research and Advanced Technology (ijerat) (E-ISSN 2454-6135) 5, no. 7 (July 20, 2019): 100–109. Accessed April 10, 2025. https://ijerat.com/index.php/ijerat/article/view/115.