1.
Analysis of Building Information Modeling (BIM) 4D-5D Method to Minimize the Occurrence of Variation Orders in Design and Build Contract Models. IJERAT [Internet]. 2023 Dec. 16 [cited 2024 Dec. 22];9(12):1-13. Available from: https://ijerat.com/index.php/ijerat/article/view/697