1.
Failure Analysis and Optimization of Maintenance for the Main Shaft of 1500kw Wind Turbine. IJERAT [Internet]. 2018 May 5 [cited 2024 Dec. 26];4(5):25-9. Available from: https://ijerat.com/index.php/ijerat/article/view/420