Crossref DOI: 10.31695/IJERAT
ISSN: 2454-6135
Email: editorijerat@gmail.com

International Journal of Engineering Research and Advanced Technology (IJERAT)

Sign In  /  Sign Up

Article: RISK MANAGEMENT OF PILE FOUNDATION WORK USING ANALYTICAL__ampersandsignnbsp;HIERARCHY PROCESS METHOD (AHP)

Article Category: Civil and Structural Engineering

DOI: 10.31695/IJERAT.2019.3445

Pages: 37-46

Author: Alitra,Resmi Bestari,Bambang Purwoko K.B

Abstract: Risk factors as the cause of the condition are not expected to cause any harm, damage or loss. The measure of risk based on the probability of failure of structural and monetary consequences of failure, and accounts for the material damage from time to time. The purpose of this study was to determine the factors (events that enable the) risk on pile foundation work and determine the weight/risk priority ranking of pile foundation work execution. This study uses analysis Analytical Hierarchy Process (AHP) to obtain risk factors pile foundation dominant conveyor manufacturing building consisting of 21 risk factors (criteria). The risk assessment carried out by 5 (five) Expert. The results in getting the expert assessment of the risk factors pile foundation work of the most dominant is the criterion of cost control systems are a weak and weak time control system.




Keyword: Analytical Hierarchy Process, Risk Management, Foundations Piles.

Web Counter

Creative Commons Attribution 4.0 (International) Licence.(CC BY-NC 4.0)

-->