Productivity Analysis f Performance Measurement by (Earned Value Management) EVM in High-Level Building Projects
DOI:
https://doi.org/10.31695/IJERAT.2020.3624Keywords:
EVM Method, Scheduling, Construction ProjectAbstract
Project scheduling helps show the relationship of each activity to other activities and to the entire project, identifies relationships that should take precedence between activities, and shows a realistic estimated time for each activity. EVM (Earned Value Management) is one of the measurement methods to objectively measure project performance and progress. This method can integrate time and cost so that it can know whether a project is running faster or slower than the schedule that is supposed to and to know whether the project costs are greater or smaller than they should have planned. The steps in the EVM calculation are included in the control process in which the steps are carried out such as calculations, analysis, forecasting, cost reporting and schedule performance for project stakeholder evaluations and actions. This study aims to calculate, analyze and measure the performance of the Wisma Atlet Kemayoran-Central Jakarta project schedule using the EVM method. With the EVM method, it is expected that the costs and time for the project can be controlled so that the project can be completed on time and the costs incurred according to the project budget.
References
Subandiyah Azis et al, ‘ Optimization of Rescheduling and Economy Analysis of the Implementation of Kwitang Office Park Building Construction Project in Jakarta’, Contemporary Engineering Sciences, Vol. 10, 2017, no. 7, 317 – 333
S.M.B.Jaswanth et al, OPTIMIZATION OF PLANNING, SCHEDULING, AND CONTROL OF HIGH RISE CONSTRUCTION PROJECTS, International Journal of Civil Engineering and Technology (IJCIET), Volume 9, Issue 4, April 2018
Wallace Agyei, Project Planning And Scheduling Using PERT And CPM Techniques With Linear Programming: Case Study, INTERNATIONAL JOURNAL OF SCIENTIFIC & TECHNOLOGY RESEARCH, VOLUME 4, ISSUE 08, AUGUST 2015
Rama.S et al , A Study on Project Planning Using the Deterministic and Probabilistic Models by Network Scheduling Techniques, Int. Journal of Engineering Research and Application, Vol. 7, Issue 3, ( Part -4) March 2017
de Souza, A. D., et. al. , 2015. A Proposal for the Improvement of Project s Cost Predictability Using Earned Value Management and Historical Data of Cost An Empirical Study. International Journal of Software Engineering and Knowledge Engineering.
Khesal, T., et. al. 2018. Integrated cost, quality, risk and schedule control through Earned Value Management ( EVM ). Journal of Engineering, Design and Technology. https://doi.org/10.1108/JEDT-07-2018-0119
Yoga Tryas Pratama & Budi Susetyo, 2019. Cost Analysis of Facade Work in High-Rise Building by Value, International Journal of Engineering Research and Advanced Technology (IJERAT), Volume 5.
Padhye, S.L. (2000). Implementation: A Problem For Value Management Pratitioner. SAVE International Confrence Proceeding
Adi Lukman Amir & Budi Susetyo, 2019. EVALUATION OF COST AND TIME USING EARNED VALUE METHOD (EVM) AND STRUCTURAL EQUATION MODELING (SEM) IN PARKING BUILDING PROJECTS, https://repository.mercubuana.ac.id/view/divisions/557/2019.default.html
Downloads
Published
Issue
Section
License
Copyright (c) 2020 Dirga Oktrianto, Budi Susetyo
This work is licensed under a Creative Commons Attribution 4.0 International License.