Project Management for Monitoring of raw materials Conveying and storage Setup for a multi commodity product in a Food processing unit
Keywords:
Project Management, Food processing Unit, Engineering Requirement Document, Engineering Drawing, Request for quote, Vendor Fact sheet.Abstract
The paper titled “Project Management for monitoring of raw materials conveying and storage setup for a multi commodity product in a Food Processing Unit” is based on providing a best suitable set up for Conveying, Storage and dosing of multi- commodity raw material as per customer requirement for a food processing industry. The setup mainly consists of conveying the raw material from intake hopper to storage, then storage to the batch hopper using conveyors. As per the customer requirement, Engineering Drawing and Specification document were prepared using Solid Edge V.19. Project management tools like Checklists, scheduling, status tracker, organigram, time sheet, were used in tracking of the entire project. Based on the above said documents request for quote were prepared and sent to different Vendors. After receiving the quotes, detailed study is done, analyzed and comparative matrix of potential vendors were developed and submitted to Customer. Vendor fact sheet for potential vendors were prepared and submitted to customer for final decision making process along with other documents.