Implementation of Parts Database Search System (PDSS) To Improve Productivity

Authors

  • Rajendra D

Keywords:

Due Date, Increases Productivity, Reduce Decision Making Time, Reduce Dependency, Quality, Reduce training efforts

Abstract

It is very important for an Organization to meet Customer Requirement and Deliver the Products before Due date. When a Business Project starts, the flow of the project begins from Design Engineering then moves to Manufacturing Engineering and then to Tool Engineering and finally it moves to the Production. Once Design Engineering starts releasing the drawings, Manufacturing starts creating Process Plans (Routing sheets), Bill of Materials and Tool Work Orders and Tooling Engineering will start working on creating tools for the production. The company receives Engineering drawings from the Leading Manufacturers of Aerospace & Automobile sectors. They are the major leading component manufacturing in Sheet metals, Machining components, Tubes etc. Once the drawing is received from the customer, work load will pick up for Manufacturing Engineering Team but in the mean time Tooling & Production line will be waiting for Manufacturing Engineering Team to release the Tool Work Orders & Route card. Until Tool Work Orders are released Tooling Team will have less work load. In this effort we thought to increase the productivity of the Manufacturing Engineering to release maximum Tool Work Orders & Route card to the Tooling Team & start the production process at the early stage to meet due dates and to satisfy the customer needs.

Downloads

Published

2016-05-15

How to Cite

Implementation of Parts Database Search System (PDSS) To Improve Productivity. (2016). International Journal of Engineering Research and Advanced Technology (ijerat) (E-ISSN 2454-6135) DOI: 10.31695 IJERAT, 2(1), 495-508. https://ijerat.com/index.php/ijerat/article/view/322